The Malaysian Government has undertaken the Electrification of Double Track Project (EDTP), which runs through the four states of Perak, Penang, Kedah and Perlis in the northern peninsular region of Malaysia. The project involves the laying and electrification of a 329km-long double track near the existing single track that runs from Ipoh in Perak to Padang Besar in Perlis.


417km of existing track was dismantle and a new track of 759km was installed of which, 70km run on bridges and viaducts. The works featured 88,000 tonnes of rails and 1.22 million concrete sleepers.

DESIGN AND SUPERVISION OF UPGRADING OF FEDERAL ROUTE 54 SG. BULOH SELANGOR

Client Name
: MMC Corporation Berhad-Gemudia Berhad JV
Service
: Construction Inspection
Start Date
: 1st January, 2008
End Date
: 5th December, 2017
Status
: Completed