Upgrading of 4.0km Federal Route 54 to 6-Lane dual carriageway including drainage, geotechnical, street light and four bridges as follows:

-               Elevated U-turn Eastern direction

-               Damansara Damai Flyover

-               Ramp from Kepong to Toll Plaza

-               Ramp from Kepong to Sierramas

-               And from Toll Plaza to Buloh

                                 

DESIGN AND SUPERVISION OF UPGRADING OF FEDERAL ROUTE 54 SG. BULOH SELANGOR

Client Name
: Public Works Department Malaysia
Service
: Geotechnical Engineering
Start Date
: 17th January, 2005
End Date
: 13th December, 2007
Status
: Completed